Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Performance 20kg Matt Epoxy Coating for Air Spray
FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
Ensure the steel surface undergoes a thorough shot blasting or sand blasting to attain a pristine Sa2.5 level, or meticulously remove rust manually down to St3 level.
3.Construction conditions:
For optimal results, the substrate temperature must be 3°C above the dew point, with relative humidity below 85%, and wind force at or below level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent cease their interaction, necessitating a pause in construction activities. Avoid working outdoors during rainy, foggy, windy, or sandy weather, and be cautious of condensation during early mornings and late evenings.
4.Notes:
1. Prior to application, vigorously mix component A with mechanical stirring, ensuring complete homogeneity, before blending thoroughly with component B.
2. Maintain regular stirring during the coating process to avert sedimentation, which could skew the powder-to-liquid ratio and impinge on paint film quality.
3. Aim for a dry film thickness of no less than 70μm, with 1 to 2 coats recommended for optimal protection.
4. Post-mixing, utilize the two-component paint within 5 hours to maintain coating integrity, as exceeding this timeframe may degrade the quality.
5. After depleting the curing agent, ensure the container is securely sealed and used promptly to prevent unwanted reactions with atmospheric moisture, which could lead to losses.
Discuss this product for your project
Include your application, required quantity and destination.