Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Performance Anti-Corrosion Coating: Zinc Epoxy Primer for Steel
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared either by shot blasting or sand blasting to achieve a pristine Sa2.5 level, or by manual rust-removal to reach the St3 level.
3.Construction conditions:
Ensure the substrate temperature is consistently 3°C above the dew point, with relative humidity maintained below 85%, and wind force kept at or below level 3. If the substrate temperature falls below 5°C, the reaction between the epoxy resin and curing agent ceases, necessitating a halt in construction. Outdoor work should be avoided during rainy, foggy, windy, or sandy conditions, and during morning and evening condensation.
4.Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, then blend it evenly with component B for optimal results.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, which can disrupt the powder to liquid ratio and compromise the paint film's quality.
3. It is advisable to achieve a dry film thickness of at least 70μm, completing 1 to 2 coats for best performance.
4. Once mixed, the two-component paint should ideally be utilized within 5 hours to ensure coating integrity.
5. After using the curing agent, secure the container tightly and use it promptly to prevent degradation from exposure to moisture in the air.
Discuss this product for your project
Include your application, required quantity and destination.
