Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Performance Epoxy Coating System for Steel Corrosion Resistance
FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
Ensure the steel surface is meticulously prepared by shot blasting or sand blasting to Sa2.5 level, or manually clean to St3 level for maximum adhesion.
3.Construction conditions:
Maintain substrate temperature at least 3°C above dew point, with relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, halt construction as the epoxy resin's reaction with the curing agent stops. Avoid construction during adverse weather conditions such as rain, fog, strong winds, and sandy conditions. Avoid morning and evening condensation for best results.
4.Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring before combining with component B for a homogeneous blend.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, ensuring the powder to liquid ratio remains balanced for optimal paint film quality.
3. For best results, aim for a dry film thickness of ≥70μm, applying 1 to 2 coats as necessary.
4. Use the mixed two-component paint within 5 hours to avoid compromising the coating quality.
5. After using the curing agent, seal it tightly and use promptly to prevent loss from reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
