Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Performance Epoxy Zinc Primer: Anti-Corrosion Coating for Chemical Plant Safety and Durability
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: High-Performance Epoxy Zinc Primer: Anti-Corrosion Coating for Chemical Plant Safety and Durability
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously shot blasted or sandblasted to Sa2.5 level, or manually rust-removed to the St3 level.
3. Construction conditions:
The substrate temperature must be 3°C above the dew point, relative humidity below 85%, wind force not exceeding level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent cease to react, necessitating a halt in construction. Avoid adverse weather conditions such as rain, fog, strong winds, sandstorms, and condensation during morning and evening outdoor applications.
4. Notes:
1. Prior to use, employ mechanical stirring to homogenize component A, then blend it thoroughly with component B.
2. Stir the mixture regularly during application to avoid sedimentation, which could disturb the powder-to-liquid ratio and compromise the quality of the paint film.
3. It is advised that the dry film thickness should be at least 70μm, with 1 to 2 coats applied.
4. After mixing, the two-component paint should ideally be utilized within 5 hours. Exceeding this period may adversely affect coating quality.
5. Once the curing agent is depleted, seal it tightly and consume it promptly to prevent losses due to reactions with ambient water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
