Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Performance Epoxy Zinc Primer: Corrosion Protection for Chemical Facilities
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: High-Performance Epoxy Zinc Primer: Corrosion Protection for Chemical Facilities
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is expertly shot blasted or sand blasted to achieve Sa2.5 level, or manually rust-removed to attain St3 level.
3. Construction conditions:
Ensure the substrate temperature is consistently 3°C above the dew point, with relative humidity maintained below 85%, and wind force not exceeding level 3. Construction should pause if the substrate temperature falls below 5°C as the epoxy resin and curing agent will halt reaction. Avoid construction during rainy, foggy, windy, and sandy conditions, as well as during condensation in the morning and evening for outdoor projects.
4. Notes:
1. Prior to application, mechanized stirring is essential to blend component A thoroughly, followed by uniform mixing with component B.
2. Conduct regular stirring during the coating process to prevent sedimentation, which could disrupt the powder to liquid ratio and compromise the paint film's quality.
3. We recommend a dry film thickness of at least 70μm, ensuring the application of 1 to 2 coats for optimal performance.
4. Post-mixing, utilize the two-component paint within 5 hours to maintain premium coating quality.
5. Securely cover the curing agent promptly after use and consume it as soon as possible to prevent unwanted reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
