Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Performance Epoxy Zinc Primer for Surface Protection
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared, either shot blasted or sand blasted to the stringent Sa2.5 level, or carefully rust-removed to achieve the St3 level.
3.Construction conditions:
Ensure the substrate temperature surpasses the dew point by at least 3°C, with relative humidity maintained under 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the reactive process between the epoxy resin and curing agent halts, necessitating a pause in construction. Construction should be avoided during inclement weather such as rain, fog, strong winds, sandy conditions, and periods of morning and evening condensation for outdoor applications.
4.Notes:
1. Prior to usage, thoroughly agitate component A using mechanical stirring for an even mix, then blend seamlessly with component B.
2. Consistently stir during the coating process to avert sedimentation, which may disrupt the balance of powder to liquid ratio, adversely affecting the quality of the paint film.
3. For optimal results, ensure the dry film thickness is maintained at ≥70μm, completing 1 to 2 coats effectively.
4. It is advisable that the two-component paint be utilized within 5 hours post-mixing. Delays could compromise coating quality.
5. Post usage of the curing agent, ensure it is tightly sealed and consumed swiftly to prevent reaction with atmospheric moisture leading to potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
