Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Performance Epoxy Zinc Rich Primer Paint with Matt Finish
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is professionally shot blasted or sand blasted to the high precision Sa2.5 level, or manually rust-removed to a meticulous St3 level.
3.Construction conditions:
For optimal application, ensure the substrate temperature is at least 3°C above the dew point with a relative humidity of less than 85%, and wind force not exceeding level 3. Should the substrate temperature fall below 5°C, pause construction as the epoxy resin and curing agent cease to react. Steer clear of rainy, foggy, windy, and sandy conditions, as well as morning and evening condensation for outdoor projects.
4.Notes:
1. To begin, utilize mechanical stirring to achieve a uniform mix of component A, then thoroughly blend it with component B.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, which could disrupt the powder to liquid balance and impact the quality of the paint film.
3. Aim for a dry film thickness of ≥70μm, completing 1 to 2 coats for optimal protection.
4. Post-mixing, the two-component paint should ideally be used within 5 hours. Exceeding this timeframe may detrimentally affect coating quality.
5. After the curing agent is consumed, seal it tightly and utilize promptly to avoid losses from potential reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
