Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Performance Matt Epoxy Paint Primer for Applications
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to Sa2.5 level, ensuring optimal adherence, or via manual rust-removal to St3 level.
3.Construction conditions:
The substrate temperature must be meticulously maintained at least 3°C above the dew point, with relative humidity below 85%, and wind force not exceeding level 3. Construction should cease when the substrate temperature falls below 5°C, as the epoxy resin and curing agent cease to react. Avoid any construction during adverse weather conditions such as rain, fog, high winds, or sandstorms, and also during morning and evening times when condensation is likely.
4.Notes:
1. Prior to use, ensure thorough mechanical stirring of component A for uniformity, followed by an even mixture with component B.
2. During the coating process, regular stirring is essential to prevent sedimentation, which could disrupt the powder-to-liquid ratio and undermine the quality of the paint film.
3. It is advisable for the dry film thickness to be at least 70μm, achieved in 1 to 2 coats to ensure optimal protection.
4. After mixing, the two-component paint should ideally be utilized within 5 hours to maintain the integrity of the coating.
5. Once the curing agent is opened, it must be securely covered and utilized promptly to prevent degradation or losses due to reactions with ambient moisture.
Discuss this product for your project
Include your application, required quantity and destination.
