Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Performance Matt Epoxy Primer Coating for Optimal Coverage
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
Ensure optimal performance by treating the steel surface with shot blasting or sand blasting to Sa2.5 level, or manually removing rust to achieve St3 level.
3.Construction conditions:
For peak effectiveness, keep the substrate's temperature at least 3°C higher than the dew point with relative humidity below 85%, and wind force no greater than level 3. If the substrate temperature falls below 5°C, the chemical reaction between epoxy resin and curing agent ceases; hence, construction should be halted. Avoid construction during adverse weather conditions such as rain, fog, wind, and sandy weather, and watch for condensation in the morning and evening.
4.Notes:
1. Prior to application, mechanically stir component A to achieve uniformity, then blend thoroughly with component B.
2. Maintain regular stirring during the application to prevent sedimentation which could alter the powder-to-liquid ratio, potentially compromising the paint film's quality.
3. For successful application, ensure the dry film thickness is at least 70μm, recommending completion in 1 to 2 coats.
4. Once mixed, the two-component paint should be consumed within 5 hours to maintain coating quality.
5. After using the curing agent, cover it tightly and utilize promptly to avoid loss due to reaction with moisture in the air.
Discuss this product for your project
Include your application, required quantity and destination.
