Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Performance Matt Epoxy Primer Coating for Tough Conditions
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
For optimum performance, the steel surface should be meticulously prepared through shot blasting or sandblasting to a pristine Sa2.5 level, or manually treated to a high-quality St3 level.
3.Construction conditions:
Ensure the substrate temperature is consistently 3°C above the dew point, with a relative humidity less than 85%, and wind forces not exceeding level 3. Note: If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease to react, halting construction. Avoid construction during adverse weather such as rain, fog, strong winds, or sand, and steer clear of condensation periods in the morning and evening during outdoor projects.
4.Notes:
1. Prior to application, utilize mechanical stirring to thoroughly mix component A, ensuring a homogeneous blend with component B subsequently.
2. Consistently stir during the coating process to avert sedimentation, which could disrupt the powder-to-liquid ratio, thus impacting the paint film's quality.
3. It is advisable to achieve a dry film thickness of at least 70μm, completing one to two coats for best results.
4. Upon mixing, the two-component paint should ideally be utilized within 5 hours to maintain the integrity of the coating quality.
5. Post-use, seal the curing agent tightly to prevent exposure to moisture in the air, minimizing losses due to potential reactions with water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
