Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Performance Matt Epoxy Zinc Rich Primer Paint for Easy Application
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface should be meticulously shot blasted or sand blasted to a Sa2.5 level, or rust removed manually to a St3 level for optimal results.
3. Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity under 85%, and wind force no greater than level 3. When substrate temperatures fall below 5°C, the epoxy resin and curing agent cease to react, halting construction. Steer clear of rainy, foggy, windy, or sandy days, as well as morning and evening condensation, especially for outdoor projects.
4. Notes:
1. Prior to use, thoroughly blend component A using mechanical stirring, then evenly combine with component B for optimum performance.
2. Regular stirring during application is essential to prevent sedimentation, ensuring a balanced powder-to-liquid ratio and maintaining the paint film's quality.
3. It's advisable for the dry film thickness to meet or exceed 70μm, with 1 to 2 coats applied for effective coverage.
4. Once mixed, the two-component paint should ideally be used within 5 hours to maintain coating quality. Prolonged times can degrade performance.
5. After utilizing the curing agent, seal it tightly and use promptly to avert potential reactions with atmospheric moisture, preventing unwanted losses.
Discuss this product for your project
Include your application, required quantity and destination.
