Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Pressure Air Spray Epoxy Coating - 20kg, Matt Finish
FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface must undergo shot blasting or sand blasting to achieve a Sa2.5 level, or alternatively, it should be manually rust-removed to the St3 level.
3.Construction conditions:
Ensure that the substrate temperature exceeds the dew point by at least 3°C with relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the reaction between epoxy resin and curing agent ceases; hence, construction should be paused. Refrain from outdoor construction during rainy, foggy, windy, and sandy conditions, as well as during morning and evening condensations.
4.Notes:
1. Prior to use, mechanically stir component A thoroughly before mixing it evenly with component B.
2. Regular stirring during the coating application is essential to prevent sedimentation, which could disrupt the powder-to-liquid balance and compromise the paint film quality.
3. The recommended dry film thickness is ≥70μm, with 1 to 2 coats advised for optimal coverage.
4. After mixing, utilize the two-component paint within 5 hours; surpassing this duration may adversely affect the coating quality.
5. Once the curing agent is opened, ensure it is sealed properly and consumed promptly to avoid reaction with ambient water vapor, which could lead to loss.
Discuss this product for your project
Include your application, required quantity and destination.
