Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Pressure Air Spray Zinc Rich Epoxy Paint
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2.5-6.5 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 6.50 / kg |
| 1,000-999,999 kg | USD 4.50 / kg |
| 1,000,000+ kg | USD 2.50 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Singal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Zinc Rich Epoxy Primer Sewage Plant Metal Protection Anti Corrosive Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface should be shot blasted or sandblasted to Sa2.5 level, or manually de-rusted to St3 level for optimal adhesion.
3. Construction Conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. Note that if the substrate temperature falls below 5°C, the epoxy resin and curing agent cease reactions, halting construction. Avoid construction on rainy, foggy, windy, or sandy days, as well as mornings and evenings when condensation is likely outdoors.
4. Notes:
1. Prior to application, use mechanical stirring to mix component A thoroughly, then combine with component B for a consistent blend.
2. Stir regularly during application to prevent sedimentation, which could disrupt the powder-to-liquid ratio and compromise the paint film quality.
3. The recommended dry film thickness is ≥70μm, with 1 to 2 coats applied for desired protection.
4. Once mixed, it is optimal to consume the two-component paint within 5 hours to maintain coating quality.
5. After using the curing agent, seal the container tightly and use promptly to avoid losses from reactions with atmospheric moisture.
Discuss this product for your project