Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High-Pressure Airless Spray Epoxy Coating - Matt Finish, 20kg Barrel
FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
Ensure the steel surface is meticulously shot or sand blasted to Sa2.5 level, or manually rust-removed to St3 level for optimal results.
3. Construction Conditions:
The substrate temperature must consistently exceed the dew point by 3°C, with relative humidity maintained at <85% and wind force ≤ level 3. When temperatures drop below 5°C, the reaction between epoxy resin and curing agent halts, necessitating a pause in construction. Refrain from outdoor work during rainy, foggy, windy, sandy conditions, and avoid early morning and evening condensation.
4. Notes:
1. Employ mechanical stirring to ensure component A is thoroughly mixed before combining it with component B for uniformity.
2. Continually stir during the coating process to avert sedimentation, which may disrupt the powder to liquid ratio, potentially compromising the paint film's integrity.
3. Aim for a dry film thickness of ≥70μm, completing 1 to 2 coats for optimal application.
4. Utilize the mixed two-component paint within 5 hours to maintain coating quality. Exceeding this period may deteriorate the finish.
5. Once the curing agent is depleted, promptly seal it and use it swiftly to prevent adverse reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.