Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Pressure Airless Spray Epoxy Coating
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Duble Component Epoxy Anti Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to achieve an immaculate Sa2.5 level. Alternatively, manual rust removal can be conducted to meet the St3 level.
3.Construction conditions:
Ensure optimal conditions for application: the substrate must consistently register a temperature 3°C above the dew point, with the relative humidity maintained below 85% and wind force not exceeding level 3. If substrate temperatures drop below 5°C, halt epoxy resin and curing agent reactions to safeguard the construction process. Avoid adverse weather conditions such as rain, fog, or strong winds and prevent condensation during morning and evening outdoor projects.
4.Notes:
1. Prior to application, employ mechanical stirring to expertly blend component A, ensuring a uniform mix with component B.
2. Maintain consistent stirring during the coating procedure to avert sedimentation, which could disrupt the powder-to-liquid ratio and compromise the paint film's quality.
3. For best results, aim for a dry film thickness of ≥70μm and apply 1 to 2 coats accordingly.
4. Once mixed, the two-component paint should ideally be utilized within 5 hours to prevent a decline in coating quality.
5. Securely cover the curing agent immediately after use and consume promptly to avoid losses from reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
