Model: FD-H001

FD-H001 High Pressure Airless Spray Epoxy Coating

FD-H001 two-component epoxy anti-corrosion coating for steel substrates.

Reference price (FOB)

US $2-10 / kg

QuantityReference price
100-999 kgUSD 10.00 / kg
1,000-999,999 kgUSD 6.00 / kg
1,000,000+ kgUSD 2.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Factory Price Duble Component Epoxy Anti Corrosive Primer Coating

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to achieve an immaculate Sa2.5 level. Alternatively, manual rust removal can be conducted to meet the St3 level.

3.Construction conditions:
Ensure optimal conditions for application: the substrate must consistently register a temperature 3°C above the dew point, with the relative humidity maintained below 85% and wind force not exceeding level 3. If substrate temperatures drop below 5°C, halt epoxy resin and curing agent reactions to safeguard the construction process. Avoid adverse weather conditions such as rain, fog, or strong winds and prevent condensation during morning and evening outdoor projects.

4.Notes:
1. Prior to application, employ mechanical stirring to expertly blend component A, ensuring a uniform mix with component B.
2. Maintain consistent stirring during the coating procedure to avert sedimentation, which could disrupt the powder-to-liquid ratio and compromise the paint film's quality.
3. For best results, aim for a dry film thickness of ≥70μm and apply 1 to 2 coats accordingly.
4. Once mixed, the two-component paint should ideally be utilized within 5 hours to prevent a decline in coating quality.
5. Securely cover the curing agent immediately after use and consume promptly to avoid losses from reactions with atmospheric water vapor.

FD-H001 High Pressure Airless Spray Epoxy Coating
FD-H001 High Pressure Airless Spray Epoxy Coating

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote