Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Pressure Airless Spray Epoxy Zinc Coating - 20kg Matt Finish
FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- Signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Epoxy Zinc Primer Anti-Corrosive Coating for Chemical Plant Safety and Durability
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared with shot or sand blasting to achieve a pristine Sa2.5 level, or carefully manually cleaned to St3 level, ensuring optimal adherence.
3.Construction conditions:
Ensure that the substrate temperature remains 3°C above the dew point. Maintain relative humidity below 85% with wind force at or below level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease to react, necessitating a halt in construction. Steer clear of construction during rainy, foggy, windy, and sandy conditions, as well as morning and evening condensation.
4.Notes:
1. Prior to use, employ mechanical stirring to achieve a uniform mix of component A, then seamlessly blend it with component B.
2. Consistently stir during application to prevent sedimentation, ensuring a balanced powder to liquid ratio and maintaining the integrity of the paint film.
3. Aim for a dry film thickness of ≥70μm through 1 to 2 coats for optimal protection.
4. Post-mixing, the two-component paint should be utilized within 5 hours to preserve quality. Exceeding this timeframe may compromise the coating's efficacy.
5. Upon depletion, the curing agent must be securely sealed and used promptly to avert losses due to reactions with ambient water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
