Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Pressure Airless Spray Matt Epoxy Coating
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface must be treated through shot blasting or sand blasting to reach Sa2.5 level, or meticulously rust-removed to St3 level by hand.
3. Construction conditions:
Ensure substrate temperature is at least 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, halt construction as the epoxy resin and curing agent reaction stops. Refrain from outdoor construction during rainy, foggy, windy, and sandy weather, as well as morning and evening condensation.
4. Notes:
1. Prior to usage, employ mechanical stirring to thoroughly mix component A, then blend it evenly with component B.
2. During the coating process, maintain regular stirring to avert sedimentation that may distort the powder-to-liquid balance, impacting the paint film's quality.
3. Aim for a dry film thickness of ≥70μm, completing 1 to 2 coats for optimal results.
4. Post-mixing, use the two-component paint within 5 hours to preserve coating quality.
5. After utilizing the curing agent, ensure it is tightly sealed and consumed promptly to prevent reactions with atmospheric water vapor, avoiding potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
