Model: FD-H001

FD-H001 High Pressure Airless Spray Zinc Rich Epoxy Paint - Matt Finish

FD-H001 two-component epoxy anti-corrosion coating for steel substrates.

Reference price (FOB)

US $2.5-6.5 / kg

QuantityReference price
100-999 kgUSD 6.50 / kg
1,000-999,999 kgUSD 4.50 / kg
1,000,000+ kgUSD 2.50 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
Singal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Zinc Rich Epoxy Primer Sewage Plant Metal Protection Anti Corrosive Paint

1. Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2. Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.

3. Construction conditions:
The substrate temperature must be 3°C higher than the dew point, and relative humidity should be less than 85%. Wind force should be no greater than level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent will cease to react, and construction must be halted. Avoid performing outdoor application on rainy, foggy, windy, and sandy days, as well as during morning and evening condensation.

4. Notes:
1. Prior to use, ensure component A is uniformly mixed using mechanical stirring, followed by thorough mixing with component B.
2. Consistently stir during the application process to avert sedimentation, which might disturb the powder to liquid ratio, thereby affecting the quality of the paint film.
3. It is advisable for the dry film thickness to be at least 70μm, with 1 to 2 coats completed.
4. Post-mixing, the two-component paint should ideally be consumed within 5 hours. Surpassing this timeframe may impair the coating quality.
5. After utilizing the curing agent, ensure the container is tightly sealed and utilize the remaining product promptly to prevent degradation due to reaction with moisture in the air.

FD-H001 High Pressure Airless Spray Zinc Rich Epoxy Paint - Matt Finish
FD-H001 High Pressure Airless Spray Zinc Rich Epoxy Paint - Matt Finish

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote