Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Industrial Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface is meticulously shot blasted or sand blasted to the Sa2.5 level, or manually rust-removed to the St3 level, ensuring a perfect base for coating.
3. Construction Conditions:
The substrate temperature must always be 3°C above the dew point, with relative humidity maintained below 85%, and wind force kept at or below level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent will cease reacting, pausing construction. Avoid rainy, foggy, windy, or sandy conditions, and steer clear of morning and evening condensation for outdoor application.
4. Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, and subsequently blend it well with component B.
2. Ensure periodic stirring throughout the coating process to prevent sedimentation, which could disrupt the powder-to-liquid ratio, affecting the quality of the final paint film.
3. It is advised that the dry film thickness should meet or exceed 70μm, with 1 to 2 coats applied to achieve this.
4. Once mixed, the two-component paint should ideally be used within 5 hours to ensure optimal coating quality.
5. Once the curing agent is depleted, seal the container tightly and utilize it promptly to prevent losses from reactions with moisture in the air.
Discuss this product for your project
Include your application, required quantity and destination.
