Model: FD-H001

FD-H001 Industrial Epoxy Primer Coating

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $2-10 / kg

QuantityReference price
100-999 kgUSD 10.00 / kg
1,000-999,999 kgUSD 6.00 / kg
1,000,000+ kgUSD 2.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating

1. Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxy resinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2. Surface Treatment:
The steel surface is meticulously shot blasted or sand blasted to the Sa2.5 level, or manually rust-removed to the St3 level, ensuring a perfect base for coating.

3. Construction Conditions:
The substrate temperature must always be 3°C above the dew point, with relative humidity maintained below 85%, and wind force kept at or below level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent will cease reacting, pausing construction. Avoid rainy, foggy, windy, or sandy conditions, and steer clear of morning and evening condensation for outdoor application.

4. Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, and subsequently blend it well with component B.
2. Ensure periodic stirring throughout the coating process to prevent sedimentation, which could disrupt the powder-to-liquid ratio, affecting the quality of the final paint film.
3. It is advised that the dry film thickness should meet or exceed 70μm, with 1 to 2 coats applied to achieve this.
4. Once mixed, the two-component paint should ideally be used within 5 hours to ensure optimal coating quality.
5. Once the curing agent is depleted, seal the container tightly and utilize it promptly to prevent losses from reactions with moisture in the air.

FD-H001 Industrial Epoxy Primer Coating
FD-H001 Industrial Epoxy Primer Coating

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote