Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Industrial Grade Dual-Component Epoxy Primer for Anti-Corrosion Protection
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface can be expertly shot or sand-blasted to an immaculate Sa2.5 level, or meticulously rust-removed to St3 level manually.
3. Construction conditions:
The substrate temperature must be maintained at a minimum of 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. If substrate temperature drops below 5°C, reactions between epoxy resin and curing agent cease, halting construction. Avoid construction on days with inclement weather such as rain, fog, high winds, or sand, as well as during morning and evening condensation for outdoor applications.
4. Notes:
1. Before use, employ mechanical stirring to achieve an even mix of component A, then blend thoroughly with component B.
2. Stir the mixture regularly during the coating process to prevent sedimentation, which may disrupt the powder to liquid balance, potentially compromising the quality of the paint film.
3. Achieving a dry film thickness of ≥70μm is recommended, with 1 to 2 coats for optimal results.
4. Post-mixing, the two-component paint should ideally be used within 5 hours to maintain coating integrity.
5. After the curing agent is consumed, ensure the container is sealed tightly and utilize it promptly to prevent any adverse reactions with ambient water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
