Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Paint Primer for Air Spray and Brush
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared by shot blasting or sand blasting to an impeccable Sa2.5 level, or manually polished with care to reach St3 level.
3.Construction conditions:
Ensure the substrate temperature maintains a steady 3°C above the dew point, with relative humidity comfortably below 85%, and wind force not exceeding level 3. Construction should be halted when temperatures fall below 5°C, as this prevents the reaction between epoxy resin and curing agent. Steer clear of rainy, foggy, or windy conditions, as well as sandy days and morning/evening condensation, especially during outdoor applications.
4.Notes:
1. Prior to application, employ mechanical stirring to achieve an even mixture of Component A, followed by the integration of Component B, ensuring consistency throughout.
2. Maintain periodic stirring during the coating process to prevent sedimentation, which could disrupt the crucial powder-to-liquid balance, thereby affecting the quality of the resultant paint film.
3. For optimal results, it's advised to maintain a dry film thickness of at least 70μm, applying 1 to 2 coats accordingly.
4. Once mixed, the two-component paint should ideally be utilized within a 5-hour window to uphold superior coating quality.
5. After the curing agent has been expended, ensure it is securely sealed and consumed promptly to mitigate potential reactions with atmospheric water vapor that could lead to unforeseen losses.
Discuss this product for your project
Include your application, required quantity and destination.
