Model: FD-H001

FD-H001 Matt Epoxy Paint Primer for Brush, Roll, and Spray Techniques

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface is meticulously prepared with either shot blasting or sand blasting to the high standard of Sa2.5, or manually cleaned to the St3 level, ensuring optimal adhesion and performance.

3.Construction conditions:
To ensure impeccable results, maintain substrate temperatures at least 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. Note that temperatures below 5°C halt the reaction between the epoxy resin and curing agent, necessitating a pause in construction. Eschew construction on days of rain, fog, strong winds, or sand, and avoid morning and evening dew for outdoor projects.

4.Notes:
1. Prior to use, ensure mechanical stirring of component A to achieve uniformity, followed by its combination with component B.
2. Stir regularly during application to avert sedimentation, which could disrupt the powder-to-liquid balance and compromise the paint film's integrity.
3. Aim for a dry film thickness of at least 70μm, achieved over 1 to 2 coats for optimal protection.
4. The mixed two-component paint is best utilized within a 5-hour window to maintain coating quality.
5. Ensure the curing agent is tightly sealed post-use and consumed swiftly to mitigate loss from reactions with atmospheric water vapor.

FD-H001 Matt Epoxy Paint Primer for Brush, Roll, and Spray Techniques
FD-H001 Matt Epoxy Paint Primer for Brush, Roll, and Spray Techniques

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote