Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Paint Primer for Brush, Roll, and Spray Use
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to a precise Sa2.5 level, or manually rust-removed to a perfect St3 level.
3.Construction conditions:
Ensure the substrate temperature is 3°C above the dew point, with relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent halt their reaction, necessitating a stop in construction. Outdoor application should avoid rainy, foggy, windy, and sandy conditions, as well as condensation during morning and evening.
4.Notes:
1. Prior to use, mechanically stir component A thoroughly, then blend seamlessly with component B for optimal results.
2. Maintain regular stirring during the application process to prevent sedimentation, ensuring an ideal powder-to-liquid ratio and preserving the paint film's quality.
3. Aim for a dry film thickness of at least 70μm, completing 1 to 2 coats for best performance.
4. After mixing, utilize the two-component paint within 5 hours to maintain the impeccable quality of the coating.
5. Once the curing agent is depleted, promptly seal and consume it to prevent losses caused by reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
