Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Paint Primer for High Pressure and Brush Use
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface should be meticulously prepared, utilizing shot blasting or sand blasting to achieve Sa2.5 level, or manually rust-removed to St3 level to ensure optimal adherence.
3.Construction conditions:
Ensure that the substrate temperature is consistently 3°C higher than the dew point, with relative humidity maintained at less than 85%, and wind force not exceeding level 3. Notably, when the substrate temperature falls below 5°C, the epoxy resin and curing agent halt their reaction, necessitating a pause in construction activities. Avoid conducting work on rainy, foggy, windy, or sandy days and steer clear of morning and evening condensation for any outdoor projects.
4.Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring until uniform, then blend it evenly with component B.
2. It is vital to regularly stir the mixture during the coating process to prevent sedimentation; failure to do so can disrupt the balance of powder to liquid ratio, compromising the quality of the paint film.
3. For optimal coverage, it is recommended to achieve a dry film thickness of at least 70μm, with the application of 1 to 2 coats.
4. Once mixed, the two-component paint should ideally be used within 5 hours to maintain the coating's integrity. Exceeding this time frame could degrade the quality.
5. After utilization, tightly cover the curing agent to avoid any undesirable reactions with moisture in the air and to prevent wastage.
Discuss this product for your project
Include your application, required quantity and destination.
