Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Paint Primer for Various Application Methods
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is expertly shot blasted or sand blasted to a pristine Sa2.5 level, or meticulously rust-removed to a St3 level of purity.
3.Construction conditions:
Optimal conditions require the substrate temperature to exceed the dew point by 3°C, with relative humidity maintained below 85% and wind conditions not exceeding level 3. If the substrate temperature drops below 5°C, the chemical reaction between the epoxy resin and curing agent halts, necessitating a pause in construction. Avoid adverse weather conditions such as rain, fog, strong winds, and sandy environments, as well as morning and evening dew for outdoor projects.
4.Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring to achieve uniformity, followed by an even blend with component B.
2. Regular stirring during the coating process is essential to prevent sedimentation, which could disrupt the powder-to-liquid ratio and compromise the integrity of the paint film.
3. Aim for a dry film thickness of at least 70μm, completing 1 to 2 coats for optimal coverage.
4. Utilize the mixed two-component paint within a 5-hour window to maintain coating quality, as delaying beyond this period can be detrimental.
5. Once the curing agent is opened, ensure it is sealed tightly and consumed promptly to avoid losses due to reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
