Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Primer Coating - Ideal for High Pressure Applications
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
Ensure the steel surface undergoes shot blasting or sand blasting to an Sa2.5 standard, or manually remove rust to reach an St3 level.
3. Construction conditions:
The substrate must maintain a temperature 3°C above the dew point, with humidity below 85%, and wind force not exceeding level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent cease interaction, halting construction. Avoid outdoor tasks on rainy, foggy, windy, sandy days, and during morning or evening condensation periods.
4. Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, then blend it uniformly with component B.
2. Stir frequently during application to avoid sedimentation, which may lead to an imbalance in powder to liquid ratios, affecting the paint film's integrity.
3. It is advisable for the dry film to maintain a thickness of ≥70μm, with 1 to 2 coats applied.
4. Post-mixing, utilize the two-component paint within 5 hours to ensure optimal coating quality.
5. Once the curing agent is depleted, seal tightly and use promptly to prevent degradation from air moisture reactions.
Discuss this product for your project
Include your application, required quantity and destination.
