Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Primer Coating - Ideal for Indoor and Outdoor Use
FD-H001 two-component epoxy primer for steel substrates. Intended for indoor and outdoor use. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared, achieving Sa2.5 level through shot blasting or sand blasting, or manually reaching St3 level for rust removal.
3.Construction conditions:
For optimal results, ensure the substrate temperature exceeds the dew point by 3°C, with relative humidity below 85% and wind force no more than level 3. Construction should pause if the temperature drops below 5°C, as the epoxy resin and curing agent cease to react. Avoid construction during adverse weather conditions like rain, fog, wind, sand, and during morning or evening condensation for exterior work.
4.Notes:
1. Thoroughly mix component A using mechanical stirring, ensuring uniformity, before combining it with component B for a consistent application.
2. Stir regularly during application to prevent sedimentation that could disrupt the powder-liquid balance and compromise the paint film's quality.
3. Aim for a dry film thickness of at least 70μm, with one to two coats recommended for best coverage.
4. Use the two-component paint within 5 hours of mixing to maintain coating quality, as exceeding this timeframe may impact performance.
5. After using the curing agent, ensure it is tightly sealed and consumed promptly to prevent loss from reaction with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
