Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is expertly prepared through shot or sand blasting to a pristine Sa2.5 level or is manually rust-free to an impeccable St3 standard.
3.Construction conditions:
Ensure the substrate temperature remains 3°C above the dew point with a relative humidity under 85% and wind force no greater than level 3. Note that if the substrate temperature is below 5°C, the epoxy resin and curing agent will cease reacting, halting construction. Avoid outdoor projects during rainy, foggy, windy, or sandy weather, and steer clear of morning and evening condensation.
4.Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, then ensure a perfect blend with component B.
2. Maintain regular stirring throughout the coating process to avert sedimentation, which could disrupt the powder to liquid balance and compromise paint film quality.
3. Aim for a dry film thickness of at least 70μm, applying 1 to 2 coats as necessary.
4. Once mixed, the two-component paint should be utilized within 5 hours to uphold superior coating quality.
5. Post-use of the curing agent, ensure it is securely sealed and used promptly to avoid potential losses from reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
