Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Finish Dual Component Epoxy Coating - Ideal for Brush and Roll
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Dual Component Epoxy Anti-Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface should be shot or sand blasted to Sa2.5 level, or manually rust-removed to St3 level, ensuring a pristine foundation for the coating.
3.Construction conditions:
Ensure substrate temperature is 3°C above the dew point, with relative humidity below 85%. Wind should be ≤ level 3. When substrate temperature dips below 5°C, the epoxy resin and curing agent reactions cease, halting construction. Avoid applying on rainy, foggy, or windy days and during morning or evening moisture condensation.
4.Notes:
1. Initially, ensure thorough mechanical stirring of component A before blending evenly with component B.
2. Stir regularly during application to prevent sedimentation, which may disrupt the powder to liquid ratio, impacting the quality of the paint film.
3. Recommended dry film thickness is ≥70μm, with 1 to 2 coats for optimal results.
4. Once mixed, the two-component paint should ideally be consumed within 5 hours; exceeding this time may compromise coating quality.
5. Seal the curing agent container tightly after use, and utilize promptly to avoid losses caused by reactions with airborne water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
