Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Finish Epoxy Coating - 20kg, Ideal for Airless Spray Application
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface is expertly prepared through shot blasting or sandblasting to Sa2.5 level, or manually rust-removed to St3 level.
3. Construction Conditions:
Ensure the substrate temperature is at least 3°C higher than the dew point, with a relative humidity of less than 85%, and wind force not exceeding level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent cease to react, necessitating a halt in construction. Avoid outdoor work on rainy, foggy, windy, or sandy days, and prevent condensation during morning and evening hours.
4. Notes:
1. Prior to use, thoroughly blend component A using mechanical stirring, then mix it evenly with component B.
2. Maintain regular stirring throughout the coating process to prevent sedimentation that disrupts the powder-to-liquid ratio, ensuring optimal paint film quality.
3. It is advisable for the dry film thickness to be ≥70μm, achieving this with 1 to 2 coats as needed.
4. Post-mixing, utilize the two-component paint within 5 hours to maintain coating integrity.
5. After using the curing agent, seal it tightly and consume promptly to prevent degradation from airborne water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
