Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Finish Epoxy Coating - 20kg, Ideal for High Pressure Applications
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface is meticulously shot blasted or sand blasted to Sa2.5 level, or expertly rust-removed to St3 level.
3. Construction Conditions:
The substrate temperature must be at least 3°C above the dew point, with relative humidity kept under 85%, and wind speeds ≤ level 3; when temperatures drop below 5°C, the epoxy resin and curing agent cease to react, halting construction. Outdoor construction should avoid rainy, foggy, windy, and sandy conditions, as well as morning and evening condensation.
4. Notes:
1. Before application, ensure component A is thoroughly mixed using mechanical stirring, then blend evenly with component B.
2. Regular stirring during the coating process is essential to prevent sedimentation, which may disrupt the powder-to-liquid balance and compromise the paint film's quality.
3. It is advised that the dry film thickness should be ≥70μm, and ideally, 1 to 2 coats are completed.
4. After mixing, it is best to use the two-component paint within 5 hours. Delay beyond this time may degrade the coating quality.
5. Post-usage of the curing agent, ensure it is securely covered and utilized promptly to prevent losses due to reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
