Model: FD-H001

FD-H001 Matt Finish Epoxy Primer

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

FD-H001 Matt Finish Epoxy Primer
1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxy resinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to achieve a pristine Sa2.5 level, or meticulously rust-removed to attain a St3 level.

3.Construction conditions:
Ensure the substrate temperature is consistently 3°C above the dew point with a relative humidity of <85% and wind force ≤ level 3. If the temperature falls below 5°C, the epoxy resin and curing agent cease to react, necessitating a halt in construction. Avoid outdoor construction on rainy, foggy, windy, sandy days, and during morning and evening condensation.

4.Notes:
1. Prior to use, ensure component A is evenly mixed through mechanical stirring, then combine uniformly with component B.
2. Regularly stir during the application to maintain the powder to liquid ratio balance and prevent sedimentation, ensuring optimal paint film quality.
3. Recommended dry film thickness should be ≥70μm with 1 to 2 coats expertly applied.
4. Use the mixed two-component paint within 5 hours to maintain superior coating quality.
5. Tightly seal the curing agent post-use and consume promptly to avoid losses from reactions with ambient water vapor.

FD-H001 Matt Finish Epoxy Primer
FD-H001 Matt Finish Epoxy Primer

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote