FD-H001 Matt Finish Epoxy Zinc Rich Primer Paint for Enhanced Surface Durability
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface undergoes rigorous shot blasting or sand blasting to achieve Sa2.5 level, or manual rust removal to St3 level for optimal performance.
3.Construction conditions:
Ensure substrate temperature exceeds the dew point by 3°C, with relative humidity under 85%, and wind force no greater than level 3. If substrate temperature drops below 5°C, the reaction between epoxy resin and curing agent halts; cease construction under such conditions. Avoid working in rainy, foggy, windy, or sandy weather, and during condensation periods in the morning and evening for outdoor tasks.
4.Notes:
1. Prior to application, mix component A thoroughly using mechanical stirring, then combine evenly with component B.
2. Stir periodically to maintain consistency, preventing sedimentation that could disrupt the powder to liquid ratio, affecting the final paint film's quality.
3. Recommended dry film thickness is ≥70μm, achieved with 1 to 2 coats.
4. Utilize the mixed two-component paint within 5 hours to ensure optimal coating quality.
5. Ensure the curing agent is tightly sealed after opening and use promptly to prevent any adverse reactions with atmospheric moisture.