Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Finish Epoxy Zinc Rich Primer Paint for Long-Lasting Protection
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface must be impeccably prepared by either shot blasting or sand blasting to achieve a Sa2.5 level, or through manual rust removal to reach an St3 level, ensuring maximum coating effectiveness.
3. Construction Conditions:
Ensure the substrate temperature is at least 3°C above the dew point with relative humidity below 85%, and wind force not exceeding level 3. If substrate temperature drops below 5°C, the epoxy resin and curing agent will not react properly, halting construction. Avoid adverse conditions like rain, fog, strong winds, and temperature fluctuations during outdoor applications.
4. Notes:
1. Prior to application, thoroughly mix component A with mechanical stirring, then blend uniformly with component B.
2. Continuous stirring during the coating process is crucial to prevent sedimentation, which could disrupt the powder-to-liquid balance and impair the quality of the paint film.
3. Aim for a dry film thickness of at least 70μm, completing 1 to 2 coats for optimal protection.
4. Use the mixed two-component paint within 5 hours to maintain coating integrity. Prolonged exposure may compromise quality.
5. After using the curing agent, seal it tightly to prevent any reactions with atmospheric moisture, which could lead to material loss.
Discuss this product for your project
Include your application, required quantity and destination.
