Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Matt Luster Epoxy Coating - 20kg, Ideal for High Pressure Air Spray
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is shot blasted or sandblasted to an impressive Sa2.5 level, or manually rust-removed to a commendable St3 level.
3. Construction conditions:
The substrate temperature must be a minimum of 3°C above the dew point, with relative humidity less than 85%, and wind force not exceeding level 3. Should the substrate temperature fall below 5°C, the reaction between the epoxy resin and curing agent ceases, necessitating a halt in construction. Avoid construction on rainy, foggy, windy, or sandy days, as well as during condensation events in the morning or evening, especially for outdoor applications.
4. Notes:
1. Before application, mechanically stir component A thoroughly, then blend it evenly with component B to ensure optimal performance.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, which could disrupt the powder-to-liquid balance and compromise the quality of the paint film.
3. It is advised that the dry film thickness should be no less than 70μm, with 1 to 2 coats applied to achieve the desired protection.
4. Post-mixing, the two-component paint should ideally be utilized within 5 hours to preserve its quality. Extended exposure beyond this timeframe may detrimentally affect the coating's integrity.
5. Ensure that the curing agent is sealed tightly and used promptly to avoid any losses due to reactions with moisture in the air, which can affect its efficacy.
Discuss this product for your project
Include your application, required quantity and destination.
