Model: FD-H001

FD-H001 Matt Zinc Rich Epoxy Paint

FD-H001 two-component epoxy anti-corrosion coating for steel substrates. Supplied in liquid form.

Reference price (FOB)

US $2.5-6.5 / kg

QuantityReference price
100-999 kgUSD 6.50 / kg
1,000-999,999 kgUSD 4.50 / kg
1,000,000+ kgUSD 2.50 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Color
Grey
Appearance
Liquid
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Trademark
Singal
Transport Package
Barrel Package in Pallet
Specification
35*30
Origin
Dongying China
HS Code
3208100000
Customization
Available
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Zinc Rich Epoxy Primer - Sewage Plant Metal Protection Anti-Corrosive Paint

1. Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Exhibits highshielding property withoutstanding anti-rustproperty. Offers strongadhesion and exceptional resistance tooilandwater.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2. Surface Treatment:
The steel must be shot or sand blasted to Sa2.5 level, or manually treated to St3 for optimal preparation.

3. Construction Conditions:
Ensure substrate temperature is over 3°C above dew point, RH <85%, wind ≤ level 3. Halt construction if temperature is below 5°C as epoxy and curing agents cease reaction. Avoid adverse weather and condensation.

4. Notes:
1. Prior to use, thoroughly stir component A mechanically, then mix evenly with component B.
2. Stir regularly during application to prevent sedimentation, which may disturb powder-to-liquid balance and degrade film quality.
3. Recommended dry film thickness should be ≥70μm, applied in 1 to 2 coats for best results.
4. Use mixed two-component paint within 5 hours to maintain coating quality.
5. Seal used curing agent tightly and use promptly to avoid moisture-induced loss.

FD-H001 Matt Zinc Rich Epoxy Paint
FD-H001 Matt Zinc Rich Epoxy Paint

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote