Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Professional-Grade Matt Epoxy Paint Primer for Brush and Roll
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
Ensure the steel surface is meticulously shot blasted or sand blasted to Sa2.5 level, or manually refined to St3 level for top-notch results.
3.Construction conditions:
For seamless application, maintain substrate temperature 3°C above the dew point, with relative humidity below 85%, and wind force not exceeding level 3. Construction should be halted if substrate temperature is below 5°C due to halted epoxy resin and curing agent reactions. Avoid outdoor projects during rainy, foggy, windy, or sandy days, and be cautious of morning and evening condensation.
4.Notes:
1. Prioritize mechanical stirring to uniformly mix component A, followed by integrating with component B for optimal application.
2. Consistent stirring during coating is essential to avert sedimentation, which may disrupt the powder to liquid balance, impacting paint film quality.
3. Achieve optimal protection with a dry film thickness of at least 70μm, applying 1 to 2 coats as needed.
4. Post-mixing, utilize the two-component paint within 5 hours to preserve coating quality.
5. Securely cover the curing agent after use to prevent reaction with atmospheric moisture, ensuring it is used promptly to avoid losses.
Discuss this product for your project
Include your application, required quantity and destination.
