Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Professional Matt Epoxy Paint Primer for Air Spray and Roll
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot blasted or sandblasted to a pristine Sa2.5 level, or manually rust-removed to an impeccable St3 level.
3.Construction conditions:
Ensure the substrate temperature is a minimum of 3°C above the dew point, with relative humidity maintained below 85% and wind conditions not exceeding level 3. For optimal results, halt construction if the substrate temperature drops below 5°C as the epoxy resin and curing agent cease to react. Avoid construction during inclement weather such as rainy, foggy, windy, or sandy conditions, and be cautious of morning and evening condensations when undertaking outdoor projects.
4.Notes:
1. Prior to use, employ mechanical stirring for thorough mixing of component A, followed by an even blend with component B.
2. To maintain consistency, it is crucial to regularly stir during the coating process. This prevents sedimentation, which could disrupt the powder-to-liquid ratio, hence compromising the quality of the paint film.
3. For optimal protection, it is recommended that the dry film thickness meets or exceeds 70μm, with 1 to 2 coats applied for comprehensive coverage.
4. Post-mixing, the two-component paint should be utilized within a 5-hour window to preserve coating quality, as exceeding this timeframe might lead to degradation.
5. Once the curing agent is depleted, ensure it is tightly sealed and used promptly to avert losses due to reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
