Model: FD-H001

FD-H001 Professional Matt Epoxy Paint Primer for High Pressure Airless Use

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
Alternatively, the surface can be manually rust-removed to St3 level for optimal adherence.

3.Construction conditions:
Ensure substrate temperature is at least 3°C above the dew point, with relative humidity under 85%, and wind conditions not exceeding level 3. When temperatures drop below 5°C, the reaction between epoxy resin and curing agent halts, requiring a pause in construction. Avoid outdoor applications during adverse weather conditions like rain, fog, strong winds, and sand storms, as well as during potential morning and evening condensations.

4.Notes:
1. Initiate by thoroughly mixing component A with a mechanical stirrer, followed by a complete blend with component B to achieve a uniform mixture.
2. Regular agitation during the coating process is essential to prevent settling, which can disrupt the powder-to-liquid balance and compromise the paint film quality.
3. Aim for a dry film thickness of ≥70μm, completing 1 to 2 coats for optimal durability and finish.
4. After mixing, the two-component paint should ideally be used within 5 hours to maintain superior coating quality.
5. Once the curing agent is opened, ensure it is tightly sealed and utilized promptly to avert any deterioration from exposure to atmospheric moisture.

FD-H001 Professional Matt Epoxy Paint Primer for High Pressure Airless Use
FD-H001 Professional Matt Epoxy Paint Primer for High Pressure Airless Use

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote