Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Reliable Matt Epoxy Primer Coating - Perfect for Air Spray Techniques
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The pristine steel surface should be shot or sand blasted to a smooth Sa2.5 level, or manually cleared of rust to a pristine St3 level.
3. Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity below 85%, and wind force not exceeding level 3. Construction should cease if the substrate temperature falls below 5°C, as the epoxy resin and curing agent will not react. Avoid rainy, foggy, windy, and sandy days, as well as condensation during mornings and evenings for optimal outdoor construction.
4. Notes:
1. Prior to application, employ mechanical stirring to thoroughly mix component A, then combine it uniformly with component B.
2. Consistently stir during the application process to prevent sedimentation, which can disrupt the powder to liquid ratio, compromising the film's quality.
3. It is advised that the dry film thickness reaches at least 70μm, with 1 to 2 coats applied for optimal results.
4. Post-mixing, it is recommended to use the two-component paint within a 5-hour window to ensure maximum coating quality.
5. After using the curing agent, ensure it's tightly sealed and used promptly to prevent degradation from moisture reactions.
Discuss this product for your project
Include your application, required quantity and destination.
