Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Reliable Matt Finish Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared by shot blasting or sand blasting to achieve Sa2.5 level, or manually cleaned to reach St3 level, ensuring optimal adherence and performance.
3.Construction conditions:
For successful application, ensure substrate temperature is at least 3°C above the dew point, with relative humidity under 85%, and wind conditions not exceeding level 3. Halt application if substrate temperature falls below 5°C as the epoxy resin and curing agent cease to react. Refrain from outdoor painting during inclement weather including rainy, foggy, windy conditions, and avoid morning or evening condensation.
4.Notes:
1. Begin by thoroughly mixing component A using mechanical stirring, followed by an even blend with component B for best results.
2. Maintain consistent stirring throughout application to prevent sedimentation, which can disrupt the powder to liquid ratio and compromise paint film quality.
3. It is advised to achieve a dry film thickness of at least 70μm, completing 1 to 2 coatings for superior performance.
4. Utilize the mixed two-component paint within 5 hours to ensure quality; using it beyond this window may deteriorate the coating's effectiveness.
5. After deploying the curing agent, immediately secure it tightly to avert exposure to atmospheric moisture, which can cause undesirable reactions and result in product loss.
Discuss this product for your project
Include your application, required quantity and destination.
