Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Smooth Application Matt Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
Ensure the steel surface is meticulously shot or sand blasted to Sa2.5 level, or manually rust-removed to achieve St3 level.
3.Construction conditions:
The substrate temperature must maintain at least 3°C above the dew point, with relative humidity kept below 85% and wind force not exceeding level 3. If the temperature falls below 5°C, the reaction of the epoxy resin and curing agent halts, necessitating a pause in construction. Outdoor projects should be avoided during rainy, foggy, windy, sandy days, or during morning and evening condensation.
4.Notes:
1. Prior to use, thoroughly mix component A using mechanical stirring, ensuring even blending with component B.
2. Stir regularly during the coating process to avert sedimentation which can disrupt the powder-to-liquid balance and compromise the paint film's quality.
3. The recommended dry film thickness is ≥70μm, achievable through 1 to 2 coats.
4. Post-mixing, the two-component paint should ideally be used within 5 hours. Exceeding this timeframe might degrade the coating quality.
5. Ensure the curing agent is sealed tightly once used up and utilized promptly to avoid losses from reactions with air moisture.
Discuss this product for your project
Include your application, required quantity and destination.
