Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Smooth Finish Matt Epoxy Primer Coating - Ideal for Professional Painters
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously prepared by shot blasting or sand blasting to a pristine Sa2.5 level, or, alternatively, manually rust-removed to a high-quality St3 level.
3. Construction conditions:
The substrate temperature is crucial: it must exceed the dew point by 3°C, with relative humidity kept under 85% and wind force maintained at ≤ level 3. If the temperature falls below 5°C, the reaction between the epoxy resin and curing agent halts, necessitating a pause in construction. To ensure optimal results, avoid working under adverse weather conditions such as rain, fog, strong winds, or during periods of morning and evening condensation.
4. Notes:
1. Prior to application, component A should be thoroughly mixed with mechanical stirring for uniformity, followed by blending with component B for a consistent mixture.
2. Consistent stirring during the coating process is essential to prevent sedimentation, which can lead to an imbalance in the powder-to-liquid ratio, potentially compromising the quality of the paint film.
3. For optimal performance, ensure a dry film thickness of at least 70μm, with the application of 1 to 2 coats.
4. Once mixed, the two-component paint should be utilized within 5 hours to maintain coating quality. Exceeding this time may lead to diminished effectiveness.
5. It is imperative to cover the curing agent tightly after use and consume it swiftly to prevent loss due to reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
