Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Smooth Finish Matt Epoxy Primer Coating - Ideal for Professional Use
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti-Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface can be expertly prepared by shot blasting or sandblasting to achieve a Sa2.5 level, or manually treated to St3 level.
3.Construction conditions:
For optimal application, ensure the substrate temperature remains 3°C above the dew point, with humidity below 85%, and wind force at or below level 3. Note: If substrate temperature falls below 5°C, epoxy resin and curing agents cease to react, halting construction. Avoid inclement weather conditions such as rain, fog, wind, sand, and morning/evening dew for outdoor projects.
4.Notes:
1. Prior to application, ensure uniform mixing of component A using mechanical stirring, followed by a thorough mix with component B.
2. Regular stirring during application is critical to prevent sedimentation, maintaining the integrity of the powder-liquid ratio, and ensuring paint film quality.
3. Aim for a dry film thickness of ≥70μm, recommending 1-2 coats for best performance.
4. Post-mixing, the two-component mixture should be utilized within 5 hours to avoid diminished coating quality from prolonged exposure.
5. After depletion of the curing agent, securely reseal and promptly use any remaining material to prevent loss from atmospheric moisture reactions.
Discuss this product for your project
Include your application, required quantity and destination.
