Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Zinc Epoxy Primer Coating for Steel Buildings: Anti-Corrosion Protection
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared, achieving a flawless Sa2.5 level through shot blasting or sand blasting, or a pristine St3 level via manual rust removal.
3.Construction conditions:
For optimal application, ensure that the substrate temperature exceeds the dew point by at least 3°C. Maintain relative humidity below 85% and wind force at or below level 3. Do not proceed with construction if the substrate temperature falls below 5°C, as this inhibits the reaction between the epoxy resin and curing agent. Avoid construction during inclement weather conditions such as rain, fog, or strong winds, and prevent any condensation during morning or evening for exterior projects.
4.Notes:
1. Prior to application, vigorously blend component A using mechanical stirring to ensure uniformity before combining with component B.
2. Consistently stir the mixture during application to avoid sedimentation, which may disrupt the powder-to-liquid ratio, compromising the integrity of the paint film.
3. For best results, aim for a dry film thickness of at least 70μm, typically achieved with 1 to 2 coats.
4. Post-mixing, utilize the entire batch of the two-component paint within 5 hours to maintain superior coating quality.
5. After using the curing agent, secure it promptly to avoid exposure to air, which could result in reaction with water vapor and potential product loss.
Discuss this product for your project
Include your application, required quantity and destination.
