Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Zinc Epoxy Primer Coating for Steel Structures: Anti-Corrosion Protection
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface undergoes meticulous shot blasting or sand blasting to achieve Sa2.5 level, or is carefully rust-removed manually to reach St3 level.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. If the substrate temperature dips below 5°C, the curing reaction halts, necessitating a stop in construction. Avoid conducting work in rainy, foggy, windy, or sandy weather, and steer clear of morning and evening condensation for outdoor applications.
4.Notes:
1. Prior to usage, employ mechanical stirring to thoroughly blend component A, then mix it uniformly with component B.
2. Continuously stir during the coating application to avert sedimentation, which could upset the powder-to-liquid balance and undermine the paint film's quality.
3. Aim for a dry film thickness of at least 70μm, with 1 to 2 coats recommended for optimal coverage.
4. Utilize the mixed two-component paint within a 5-hour window to maintain the highest coating quality. Delays could compromise results.
5. Once the curing agent is consumed, secure the container tightly and use it promptly to prevent adverse reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
