Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Zinc Epoxy Primer Coating for Steel Structures: Anti-Corrosion Protection System
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to achieve Sa2.5 level, or manually rust-removed to St3 level for optimal results.
3. Construction conditions:
The substrate temperature must be at least 3°C higher than the dew point, with relative humidity below 85%, and wind force not exceeding level 3. When temperatures dip below 5°C, the epoxy resin and curing agent cease to react, necessitating a halt in construction. Avoid outdoor applications during rainy, foggy, windy, or sandy conditions and during morning and evening times when condensation can occur.
4. Notes:
1. Prior to use, thoroughly mix component A using mechanical stirring, then blend evenly with component B for a consistent mixture.
2. Maintain regular stirring during the coating process to avert sedimentation, which can disrupt the powder to liquid balance and compromise the quality of the paint film.
3. Ensure that the dry film thickness meets or exceeds 70μm, with 1 to 2 coats completed for full protection.
4. Once mixed, the two-component paint should be applied within 5 hours to preserve coating quality. Exceeding this time frame can negatively impact performance.
5. After using the curing agent, seal it tightly and use it promptly to prevent losses from reactions with moisture in the air.
Discuss this product for your project
Include your application, required quantity and destination.
