Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Zinc Epoxy Primer for Sewage Plant Protection
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $2.5-6.5 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 6.50 / kg |
| 1,000-999,999 kg | USD 4.50 / kg |
| 1,000,000+ kg | USD 2.50 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Singal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Zinc Rich Epoxy Primer Sewage Plant Metal Protection Anti Corrosive Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface should be meticulously shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level, ensuring a pristine foundation.
3.Construction conditions:
For optimal conditions, ensure the substrate temperature is 3°C higher than the dew point, with relative humidity <85%, and wind force ≤ level 3. When temperatures drop below 5°C, the epoxy resin and curing agent cease to react, halting construction. Steer clear of rainy, foggy, windy, and sandy conditions, as well as morning and evening condensation for outdoor projects.
4.Notes:
1. Prior to application, employ mechanical stirring to achieve a uniform mix of component A before blending evenly with component B.
2. Regular stirring during the coating process is essential to prevent sedimentation and maintain an ideal powder to liquid ratio, safeguarding the quality of the paint film.
3. Aim for a dry film thickness of ≥70μm, completing 1 to 2 coats for best results.
4. After mixing, utilize the two-component paint within 5 hours to preserve coating quality.
5. Post-use, tightly cover the curing agent and use promptly to avert losses from reactions with moisture in the air.
Discuss this product for your project
Include your application, required quantity and destination.
