Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Zinc-Rich Epoxy Primer: The Steel Anti-Corrosion Solution
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to achieve an Sa2.5 level of cleanliness, or alternatively, manually cleaned to an impeccable St3 standard.
3.Construction conditions:
Ensure that the substrate temperature is consistently 3°C above the dew point with relative humidity maintained below 85%, and wind force not exceeding level 3; construction should halt if substrate temperature falls below 5°C as the epoxy resin and curing agent cease interaction. Avoid outdoor applications during adverse weather conditions such as rain, fog, wind, sand, and during morning or evening condensation.
4.Notes:
1. Prior to usage, thoroughly blend component A with a mechanical stirrer to achieve an even consistency before incorporating component B.
2. Maintain continuous stirring during the application process to prevent sedimentation, ensuring a balanced powder-to-liquid ratio, which is crucial for the integrity and quality of the paint film.
3. It is advisable to maintain a dry film thickness of at least 70μm, completing 1 to 2 coats for optimum effectiveness.
4. Utilize the mixed two-component paint within 5 hours to prevent any deterioration in the coating quality.
5. Ensure the curing agent container is tightly sealed after use and consumed promptly to mitigate the risk of reaction with atmospheric moisture, which can lead to potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
