Model: FD-H002

FD-H002 Matt Two-Component Epoxy Iron Oxide Red Anticorrosive Primer Coating

FD-H002 two-component epoxy primer for steel substrates. Supplied in liquid form.

Reference price (FOB)

US $4-4.5 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H002
Color
Iron Oxide Red
Appearance
Liquid
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Component
Two-Component
Trademark
Singal
Transport Package
Barrel Package in Pallet
Specification
35*30
Origin
China
HS Code
3208100000
Customization
Available
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Number of components
Two-component
Theoretical Coverage Rate
190 g/m², 6.32 m²/L (calculated at 40 μm dry film thickness, excluding wastage)
Proportion
About 1.50
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h
Fully cured
7 days
Flash Point
45 ºC
Shelf life
12 months
Mixing Ratio
Component A (Base Paint) : Component B (Curing Agent) = 4:1
Maturation Time
23 ± 2°C:0.5-1h
Pot Life
23 ± 2°C: 5h
Application Methods
Airless spraying, conventional air spraying, brushing, rolling
Thinner
X-300 Thinner
Tool Cleaning
X-300 Thinner
Film Thickness
Wet film: 160 μm Dry film: 40 μm

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

 

FD-H002 Matt Two-Component Epoxy Iron Oxide Red Anticorrosive Primer CoatingFD-H002
Premium  Matt Two-component Epoxy Iron Oxide Red Anticorrosive Primer Coating

 

Product Description:

Two-component coating composed of epoxy resin, iron oxide red, anti-corrosive pigments, additives, and thinners, packaged in Component A and Component B. This product features rapid drying speed, excellent physical and mechanical properties of the film, and superior anti-corrosive performance.

 

 
Application Fields:
Widely used for anti-corrosion protection of engineering machinery and steel structures.

FD-H002 Matt Two-Component Epoxy Iron Oxide Red Anticorrosive Primer Coating

 

Physical Parameter

Number of components Two-component
Color Iron Oxide Red
Theoretical Coverage Rate 190 g/m², 6.32 m²/L (calculated at 40 μm dry film thickness, excluding wastage)
Proportion About 1.50
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h
Fully cured 7 days
Flash Point 45 ºC
Shelf life 12 months
 

Construction Instruction

Mixing Ratio Component A (Base Paint) : Component B (Curing Agent) = 4:1
Maturation Time 23 ± 2°C:0.5-1h
Pot Life 23 ± 2°C:   5h
Application Methods Airless spraying, conventional air spraying, brushing, rolling
Thinner X-300 Thinner
Tool Cleaning X-300 Thinner
Film Thickness Wet film: 160 μm    Dry film: 40 μm

 

  Airless Spraying Conventional Air Spraying Manual Rolling and Brushing
Maximum Thinner Addition 10% 20% 15%
Nozzle Orifice 0.4-0.5mm 2.0-2.5mm  
Discharge Pressure 15-20MPa 0.3-0.6Mpa  
 

Recoating Interval

Ambient Temperature 5ºC 20ºC 30ºC
Interval 24h 16h 8h
 

Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.

 

Compatible Coatings

Epoxy resin coating,Epoxy asphalt coating etc.

 

Construction conditions:
Substrate temperature must exceed the dew point by at least 3°C, with relative humidity <85% and wind speed ≤ Level 3.Outdoor applications shall avoid rainy, foggy, or dusty conditions, as well as morning/evening dew formation.Under normal circumstances, the coated surface should not be exposed to rain within 16 hours after application.

 

Notes:

1.For difficult-to-coat areas of steel such as corners, dents, and weld seams, to prevent coating defects like bubbles and pinholes from forming in these areas, first apply a local brush coat with a brush, then proceed with large-area painting.
2.If multiple coats are required to increase the film thickness, after the completion of the previous coat and before applying the next coat, the previous coat should be inspected. Inspection items include dryness and thickness, as well as the presence of bubbles, pinholes, wrinkles, etc., so that timely adjustments and treatments can be made during the next coating process.

 

Storage:

1.The product must be stored in tightly sealed containers in a well-ventilated, dry area away from direct sunlight. The recommended storage temperature range is 0-35°C.
2.The product shelf life is 12 months from the date of manufacture. Beyond this period, the product may be retested according to specifications. If compliant, it may continue to be used.

 

Safety:

1.Use only in well-ventilated areas. Avoid inhalation of mists or vapors. Prevent contact with skin and eyes. In case of eye contact, rinse thoroughly with plenty of water and seek immediate medical attention.
2.When applying in confined or poorly ventilated spaces, mandatory forced ventilation and full protective equipment (respirator, gloves, goggles) must be used.

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote